校园供暖系统升级工程-第三期

2024年5月6日- 2024年8月9日

Phase 3 of the campus heating systems upgrade will occur this summer starting in May 2024. This part of the project includes digging up the section of Park street from the Marcus Daly statue down to the west corner of the Student Union building. 这将是第三阶段的第一部分.

This will require the section of Park street described above to be closed to campus traffic. 通往探矿者停车场的车道, 总理家的车道, 把混凝土表面铺到方庭上, MG公路以东的车道将被关闭, 从公园街无法到达.

Underground tunnel portions will be installed in the street to allow for steam supply piping, and condensate return piping to be installed in the new tunnel section. It is anticipated that this work will go on from the beginning of the second week of May through mid August of 2024. Once the tunnel is installed and buried underground then new asphalt will be installed on this section of Park Street.

Campus traffic will need to be routed along Granite Street during this process. A driveway apron will be installed off of Granite Street that allows traffic to enter into Prospector Parking lot, and to be able to make their way down Broadway street between the MG and NRRC. The service driveway that runs just west of the Student Union building will still be accessible for traffic and for deliveries, to be made to the back of the Student Union building and mail room.

2025年5月- 2025年8月

Part two of Phase 3 will likely be performed in the summer of 2025. This work included digging up the road between the Steam Plant and the Facilities building, 以及磨坊的整个北部, 在磨坊外面的楼梯之间, 以及凸起的地膜景观区. This will start at the north side of the facilities building, 绕着磨坊转, and connecting into the tunnel system of Main Hall. 这些地区将安装隧道系统, as well as new steam supply piping and condensate return piping. It is anticipated that by the time the academic year starts up in August 2025, that this area will be restored and ready for use. Vehicular traffic to the Mineral Museum and to the Facilities building will be affected by this work in 2025.

Future Campus Facilities Projects – Dates and Priorities TBD (2025 – 2030)

  • 主厅-重大翻新
  • 工程大厅——大修
  • 校园洗手间翻新-博物馆,S&E、图书馆、图书馆、图书馆
  • Campus Electrical Distribution Improvements – Museum, MG, S&E
  • Campus Exterior Masonry improvements – Sidewalks, tuckpointing, plaster repairs, etc.
  • 探矿厅电梯规划
  • 游泳池/辅助健身房改建